Home > Paul Mather, Work > Download example #MicrosoftFlow for Syncing #MSProject #Roadmap Row Item Status with #ProjectOnline Task Status #CDS #PowerPlatform #MSFlow #REST #SharePoint #WorkManagement #Office365

Download example #MicrosoftFlow for Syncing #MSProject #Roadmap Row Item Status with #ProjectOnline Task Status #CDS #PowerPlatform #MSFlow #REST #SharePoint #WorkManagement #Office365

Paul Mather
I am a Project Server and SharePoint consultant but my main focus currently is around Project Server.
I have been working with Project Server for nearly five years since 2007 for a Microsoft Gold Certified Partner in the UK, I have also been awared with the Microsoft Community Contributor Award 2011.
I am also a certified Prince2 Practitioner.

This article has been cross posted from pwmather.wordpress.com (original article)

Following on from a recent blog post where I demonstrated an example Microsoft Flow for syncing the Roadmap row item status with the associated Office 365 Project Online Task status, I have now made this solution starter Flow available as a package that can be downloaded and imported. For those of you that missed the previous blog post, a link can be found below here: https://pwmather.wordpress.com/2019/05/27/sync-msproject-roadmap-row-item-status-with-projectonline-task-status-using-microsoftflow-cds-powerplatform-msflow-rest-sharepoint-workmanagement-office365/

FlowImage

The Flow package can be downloaded from the Microsoft Gallery here: https://gallery.technet.microsoft.com/Flow-to-Sync-Roadmap-item-44174a4b

Once downloaded the Flow can be imported, here is a Microsoft Flow blog post on exporting and importing Flow packages: https://flow.microsoft.com/en-us/blog/import-export-bap-packages/

Once imported and the connections all set – this will require a Flow P1 or P2 license as it uses the CDS connector, ensure the account has the correct access to Project Online and the CDS, open the flow and update the trigger and actions as these will currently point to one of my demo tenants:

  1. Update the “When a project is published” trigger with your PWA URL
  2. Update the “GetTaskHealth” action the correct site address for your PWA URL
  3. Update the “GetTaskHealth” action Uri to use the correct task level field, replace “RoadmapHealth” as needed
  4. Update the Switch action to use the correct task custom field – the expression would be items(‘Apply_to_each’)[‘FieldName’] – replace the field name with the correct task field
  5. Ensure the Case statements are updated to match the possible values in your custom field and map to the correct roadmap status value:
      • On Track = 0
      • Potential Problem = 1
      • At Risk = 2
      • Complete = 10
      • Not Set = 100
  6. Update the “List records” action to point to the correct environment
  7. Update the “Update a record” action to point to the correct environment

Now save the Flow and test it.

Hopefully you find this useful as a solution starter.

Advertisement
Categories: Paul Mather, Work Tags:
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: